Showing posts with label 4G. Show all posts
Showing posts with label 4G. Show all posts

Thursday, July 7, 2022

Improving The Odds For 5G



Fixing the approach for networks and services is necessary for getting to 5G.

Shyam Ponappa   |  July 7, 2022 

Towards the end of 2021, the government acted admirably in the public interest, making difficult and courageous decisions to partially resolve legacy problems in telecom, such as redefining adjusted gross revenues and withdrawing retrospective tax demands. This gave rise to expectations that reforms would be less constraining, and more beneficial for the public interest. The announcement in June of  auctions and limited E-Band backhaul allocation, alas, falls far short. Why the disappointment, and how might the situation be improved?

Two areas need changes: Backhaul, and access spectrum. One aim is to remove self-imposed constraints. Another is to replicate the successful pattern of other sectors, where enterprises build their business, earn revenues, and then pay taxes. For some reason, this does not apply to communications despite it being a critical essential service.

Backhaul – E-Band

A fundamental problem is the limited backhaul spectrum. Two bands of 250 MHz of E-band spectrum (70-80 GHz) are to be assigned to each telco that wins . This is puzzling, as there are 10 GHz available (20 times 500 MHz). If press reports that this is temporary are correct because these frequencies are to be auctioned— and telcos must agree to pay the auction price at that time — the situation is disastrous, because 5G needs large backhaul capacity.

In other countries such as the US or the EU, policies are framed so as to enable usage of the full 10 GHz at minimal cost. This provides flexible capacity for much higher throughput, whereas we are creating a self-imposed constraint by restricting capacity. This means that the Organisation for Economic Co-operation and Development countries gain more from increased productivity than a developing country with the same resource. This can be remedied by adopting their regulations as appropriate.

The public interest is well served when policies enable telcos to use available resources to increase productivity and efficiency, instead of being obstructed in delivering services, or having to spend more to achieve comparable service levels. The same goes for the discriminatory allocation of spectrum to non-telcos (private companies), who will apparently be allotted spectrum on preferential terms compared with telcos. India’s networks cannot compare with those of the OECD countries that have such policies, which is why such allocations would be too disruptive here.

Just as we are deprived of network capacity because spectrum is either not permitted for use, or is extortionately priced (both self-imposed conditions), limiting wireless backhaul or pricing it high will hamstring 5G and even 4G, because wireless backhaul will not be deployed extensively if the cost is prohibitive. These circumstances are aggravated by the threat of auctions for backhaul spectrum.

Without extensive wireless backhaul, access spectrum from auctions cannot be fully utilised because of limited direct fibre connectivity. Unlike countries that have good wireless backhaul— business hubs such as Mumbai’s Bandra Kurla Complex or Nariman Point, Gurugram’s DLF Cyber Hub, Connaught Place or the Dhaula Kuan, — the Airport stretch in Delhi, hospital and medical research complexes, engineering and manufacturing clusters, and so on, are denied vastly improved communications and access to data using gigabit wireless mesh networks. Even the spread of 4G small cells is constrained, reducing efficiency and productivity.

It would be useful to base India’s regulations on what others such as the US, the EU, and the UK are doing with E-band. They require non-exclusive nationwide licences, with mandatory coordination and link registration (usually through a geolocation database). Our comparatively less developed networks make it inadvisable to adopt their policies wholesale, because it would disrupt equitable network development in India, accentuating the divide by skewing investment to the most profitable areas.

Our authorities need to focus on setting up and institutionalising processes such as non-exclusive licensing to telcos, and the mechanism of geolocation databases for backhaul spectrum for mandatory coordination and registration. Policies need to be framed so as to help builand grow gigabit wireless links to reinvigorate the sector, to recoup its stellar trajectory and contribution as in the past.

An instructive example is the approach taken by the City of London, or the “Square Mile”, in addressing communications for its 400,000 workers every day, 10 million visitors annually, and 9,000 residents. The mix of historical buildings and modern architecture poses a challenge for mobile network services. In 2017, the City initiated a project for providing free public gigabit Wi-Fi throughout the Square Mile.1 The design incorporated 4G small cells for better connectivity, and the City offered 3,000 street assets (such as lampposts), stipulating that the system must be a neutral host open to all service providers.

The project was awarded to a joint venture of which one company is active in India. The backhaul uses a self-organising millimetre wave (mmWave) mesh as a “neutral host” that enables use by multiple operators. The mesh gives all service providers gigabit backhaul and access applications at 12Gbps with its 60GHz mmWave access and backhaul.

5G Access Spectrum

Assuming the objective is ubiquitous 5G and other services, India needs a different approach. Spectrum auctions will not get us there. We achieved a level in mobile telephony by adopting a reasonable revenue share on licensing around 2003 after NTP-99. The same needs to be done for spectrum.

One proposed approach2 suggests that as there are only three serious telecom operators, spectrum can be allocated equitably to all three without auctions. This seems reasonable, as the funds diverted to auctions could then be invested in networks, and collections from revenue sharing are likely to far exceed collections from auctions, as they did after NTP-99.3 The downside is that it would require the development of three networks, unless the operators share infrastructure. An alternative approach would be mandatory infrastructure sharing with one neutral host network, or two competing networks owned by different consortiums.

If the authorities could take these points into consideration in improving the regulations, we are likely to have better outcomes in terms of networks, services, and the state of the sector.


Shyam (no space) Ponappa at gmail dot com

1) The City of London Case Study: https://www.gsma.com/futurenetworks; 

2) Rajat Kathuria and Mansi Kedia: https://indianexpress.com/article/opinion/columns; 

(3) See Chart 2: Telecom Auction Fees Foregone vs Licence Fees + Spectrum Charges at: https://organizing-india.blogspot.com/2020/08/configuring-indias-digital-ecosystem.html

Saturday, December 4, 2021

4G, 5G, or 6G - All Need Wireless Backhaul

A rose is a rose - or is there one that is sweeter?

Shyam Ponappa   |   December 2, 2021


Calling our networks 4G, 5G, or 6G makes little difference. What matters is service delivery to users. Once there is connectivity, the criteria for judging a network are speed, capacity, and latency (lag in response time). Our 4G experience is far short on these measures. Improvements are possible if our government proceeds on the basis of (a) objective assessment, and (b) concerted action on systematic, realistic, and phased plans and execution. The starting point is a factual assessment of our networks and service delivery compared with the rest of the world. The next steps are to frame policies and regulations to enable the better use of available resources for service delivery, without irrational hurdles.

An aspect of telecom not obvious to users is the reality of layered technologies that exist even in advanced environments. For instance, a country with excellent mobile services such as Norway has achieved among the fastest average speeds of over 50 Mbps with continued investment in 4G networks. 4G has evolved considerably and provides the core network, except for Standalone 5G networks. 4G has latency down to two-digit milliseconds, and speeds comparable to 5G in the lower user bands (below 6 GHz). High-frequency 5G provides faster user access on 4G platforms.

Realistically, we should plan for a mix of technologies going forward as 4G continues to evolve over the next decade. However, we need policies that result in full 4G coverage of good quality, not merely indulgent talk. Also, while 3G is being phased out because of its less efficient use of spectrum, it will take years to transition fully to 4G and beyond because of the cost and scale. In Europe, for example, even 2G is to continue until 2025 for certain applications.

What are the policies that can give us improved services? A good place to start is the Parliamentary Committee report tabled in February titled, “India’s Preparedness for 5G”.1 Its main findings are that while 59 countries had deployed 5G, though largely on a limited scale, India had not done so. No 5G trials had been permitted as of January, and sufficient preparatory work had not been done. The challenges highlighted are:

  • Inadequate spectrum, with only 50 MHz per operator, half the global average. For 4G, average spectrum per operator was even less, at a quarter of the global average.
  • Exorbitant spectrum prices.
  • Insufficient development of 5G use cases.
  • Low fibre network availability.
  • Deficient backhaul capacity.

The report emphasises the need for heavy investment to develop fibre networks, including for backhaul, and then deals with other aspects such as investments and local manufacturing.

Fibre does indeed provide the best connectivity. While highly desirable, it is the gold standard, and often prohibitively expensive. Fibre connections to towers are ordinarily justifiable only when financially viable. Second, small cells have to proliferate for 4G, 5G, and 6G, with wireless or fibre links (backhaul) to networks and Wi-Fi user access. The question is whether aiming for full or even substantial fibre connectivity to towers and small cells is realistic, compared with alternatives and technology trends.

Interestingly, the GSM Association published two reports addressing this in February 2021. The first was a study on backhaul in 40 countries titled, “Wireless Backhaul Evolution: Delivering next generation connectivity”.2 The second was on the spectrum required for this titled, “Spectrum for Wireless Backhaul: GSMA Public Policy Position”.3

The first report indicates that 5G’s growing traffic and network capabilities will need massive augmentation of backhaul capacity through evolution. Wireless links are estimated to constitute 65 per cent of global backhaul links between 2021 and 2027, evolving to higher frequencies with wider channels, with regulators’ decisions helping or hindering specific 5G markets. The E-band (70-80 GHz) is expected to dominate wireless backhaul from 2021 to 2027. Many countries are also using V-band (60 GHz) delicensed for Wi-Fi. Even countries with high levels of fibre such as Japan and South Korea are using E and V bands for backhaul. Shouldn’t we do this, too? (See chart)

Chart: Full 4G + Some 5G with V-Band and E-Band





India has many urban and rural sites where fibre is infeasible, because of factors such as congestion, distance, terrain, dispersed users, and limited commercial potential. Wireless backhaul can fill in where fibre is not accessible or affordable, although evolution to higher, wider bands will be necessary. Meanwhile, wireless V and E bands are now reasonable alternatives for distances of about 1 km, and 3-4 km or more, with the disadvantage of rain attenuation. The GSMA report suggests this could be mitigated with carrier aggregation (combining) of E-band with lower bands (such as 15, 18 or 23 GHz) to provide 10 Gbps links for up to 10 km.

Active Network Sharing

Regulators worldwide are considering or pursuing the substantial benefits of active network sharing for enhanced coverage, reduced costs, and faster deployment. A McKinsey report in 2018 cited network sharing becoming a standard model for mobile operators, with a reduction in the total cost of ownership by 30 per cent, while improving network quality.4

Steps for Consideration

Formulate policies, laws and regulations for the following, with mandated spectrum/network sharing, paid for by reasonable revenue share (2-3 per cent) after a moratorium of 3-5 years (no auctions). Cap profits, and penalise diversion of revenues/profits.

1. Small cells: For Wi-Fi user access, V-band lower range and 6 GHz (using FCC model, as done for 5 GHz). Consider 12 GHz for Wi-Fi next.

2. Wireless backhaul, small cells/towers: V-band upper range and E-band, with light-licensed sharing among telcos for connecting to networks.

3. Private networks, small cells and backhaul: V-band light-licensed* for private networks, with public network connection through licensed telcos.

* After reconsideration December 4, 2021: "V-band allowed in private spaces for private networks and extensions, with public network connection through licensed telcos."

4. Active network sharing: Consider enabling or mandating active sharing of all elements of networks to speed up deployment, reduce clutter and radiation, and for efficient capital investment.

Orchestration and coordination across government departments and consultation with industry, as for NTP-99, to ensure better outcomes.


Shyam (no space) Ponappa @ gmail dot com

1. https://eparlib.nic.in/bitstream/123456789/799780/1/17_Information_Technology_21.pdf

2. https://www.gsma.com/spectrum/wp-content/uploads/2021/02/wireless-backhaul-spectrum.pdf

3. https://www.gsma.com/spectrum/wp-content/uploads/2021/02/wireless-backhaul-spectrum-positions.pdf

4. https://www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/network-sharing-and-5g-a-turning-point-for-lone-riders

Thursday, April 1, 2021

Backsliding Without Broadband


We are losing out on so much of our potential because of regulatory constraints.

[But of course, that is only a part of the story.  The rest of it is lack of organization, and of discipline, which is a long, long story.]

Shyam Ponappa      |    April 1, 2021

Not being permitted to use available spectrumin line with technological developments and global applications is like being deprived of access to the air around one. That our way-below-par broadband is not systematically addressed as a critically important way to provide requisite infrastructure to improve people’s lives is troubling. We lose out on the facilitation of education, healthcare, productivity, commerce, industry, government services, and entertainment. Is the government unaware of our deprivation? Surely the authorities are capable of devising ways to use spectrum for the common  good. 

Whatever other matters they are busy with, this is an area that should have priority.


The difficulty is in satisfying competing demands arising from what can best be described as our collective gnarled psyche. One preoccupation is with making corporations alone pay for public resources without allowing for profits. This apparently pervades not only the government’s thinking, but extends to many people at large, in the press and media, polity, civil administration, and judiciary. Compounded with the anxiety of decision-makers to protect themselves from overzealous future witch-hunts, this ensures there are no innovative attempts at resolving our communications infrastructure needs. One also sometimes encounters sentiments questioning whether we need 5G, or faster internet, or notions that we already have adequate broadband, and so on. We are inured to dysfunctional infrastructure support, and have become habituated to accepting deficiencies in our daily lives. Whether it is dropped calls, slow internet, or sporadic failures in electricity, water supply, or logistics, we treat this shoddy state as acceptable, despite its immense drag on effectiveness and productivity.

Meanwhile, we have just embarked on yet another 4G spectrum auction, while 5G, where we are way behind global developments, seems a lifetime away. If only our policymakers and administrators actively sought ways to improve our communications, including rural broadband, for instance, we might learn from practices elsewhere in the world of adaptations that could be implemented here. One interesting instance is that of the Federal Communications Commission (FCC) in the US. Seeking to improve broadband in underserved markets, in 2019, the FCC began the Rural Digital Opportunity Fund (RDOF) initiative, to channel universal service obligation funds collected from telecom operators to get high-speed networks built and services provided in rural areas. This replaced the prior Connect America Fund programme with its lowest-bid awards that had not worked. In 2020, the FCC conducted a reverse auction for broadband services to rural users, allowing for slower delivery in more remote locations. The tentative award for Phase I is $9.2 billion (Rs 67,000 crore) over the next 10 years in monthly instalments, with time-bound completion requirements. (India has about Rs 55,000 crore in a comparable Universal Service Obligation Fund.)

Over 400 entities, many of them consortiums including electricity distribution companies, have won RDOF contracts to build networks and provide services. Most plan fibre-optic networks, but the biggest winner for $1.3 billion, LTM Broadband, plans to also use high-speed fixed wireless. Another winner, SpaceX, plans Low Earth Orbit satellites to deliver 100 Mbps. There has been criticism from some analysts and contenders who question the feasibility of gigabit wireless networks in place of fibre. This may be uninformed, but it remains to be proven that delivery is on time and profitable.


Despite the difference in our environments, the FCC’s example has useful pointers for India. One is a practicable way to channel USO funds to develop rural broadband, with performance monitoring every six months. Second, a model and time frame to design and conduct a reverse auction, and award the 10-year contracts, with minimal hype. Third, allowing for choice of technologies, including high-speed fixed wireless, satellite, and so on. Finally, a solid foundation is provided by FCC’s supportive approach to making spectrum and infrastructure sharing a reality, including 6 GHz Wi-Fi. This is the sort of action we need in place of more rhetoric.

A complementary approach is that of Sweden and other Nordic countries. Telecom operators there have been sharing infrastructure and spectrum from 2G through 4G, which is now being extended to 5G. Note that all levels of technology (2G, 3G, 4G and 5G) coexist in their networks (1).

For India, policy-makers have to develop approaches, policies, laws, adaptations, and so on that are specific to our context, including culture, institutions, practices, and geographic and social circumstances. One element likely to be necessary for ubiquitous broadband is shared networks in rural areas as well as in dense urban environments. Mandatory provision of shared infrastructure was being considered in Sweden over a decade ago. Given that government’s initiatives and Sweden’s experience with sharing thereafter, network sharing is likely to be extended for internal use without mandatory requirements. In India, too, there is need for government initiatives and incentives. This is because extensive changes in policies, laws, and regulations must be effected, requiring inter-agency coordination and convergence in government departments, legislative agencies, institutions, and among stakeholders. The latter will include service providers, manufacturers, and user groups. Sweden’s experience shows there are compelling cost and energy saving reasons for sharing, apart from environmental impact mitigation, but that without government initiatives and facilitation, the common-good outcomes are not likely to evolve naturally in India, where passive sharing has been permitted and practised for years.

Our desperate need is for revamped spectrum regulations, making the relatively straightforward changes aligned with the FCC model to the extent feasible, after due consultation with industry and other stakeholders. Extending Wi-Fi on the lines of what has already been done for 5 GHz is the first step. The target bands are 6 GHz for Wi-Fi, 60 GHz for indoor Wi-Fi and outdoor authorised shared access by licensed operators like Wi-Fi, and similar outdoor regulations for 70-80 GHz. After that [the end-to-end connectivity is enabled -- which is infeasible now], a systematic initiative is required for network sharing through consortium ownership, with similar holdings in verticals with infrastructure providers, and government participation through BSNL. All concerned government agencies will need to be involved, as must all stakeholders.


Shyam (no space) Ponappa at gmail dot com

1: https://www.nokia.com/blog/the-well-kept-secret-of-2g-3g-4g-5g-dynamic-spectrum-sharing/

Thursday, May 3, 2018

The Huawei Pointer


Taking a cue from Huawei.

Shyam Ponappa  |  May 3, 2018

Huawei has an awe-inspiring record of drive, perseverance, fortuitous circumstances, good strategy, execution, and success. A Chinese communications company founded in 1987 in Shenzhen by a former army engineer, Ren Zhengfei, Huaweiis now a legend. By 2012, it overtook industry leader Ericsson in global revenues. In 2017, its revenues were over $90 billion, two-thirds from outside China.  It also has a significant and growing presence in India. How did they do it?
Part of Huawei’s mystique stems from its outstanding founder and its driven work culture. This may be unique and difficult to replicate, but it is a byword for hard-charging Chinese high-tech. A meme that epitomises the culture is “9-9-6” — that is, for 9:00 am to 9:00 pm, 6 days a week. Can factors driving its success be adopted at the policy level and in enterprises in a democracy?
My previous column addressed the hollowing out of our manufacturing and other abilities. My suggestion is to replace obstructive policies with others that facilitate building infrastructure and local capacity, especially in growth areas. The example of Huaweiprovides a pointer. Perhaps some of what we learn can be applied at the governmental and the corporate levels.
Reports suggest these key factors in its success:
— Strong leadership with a sense of purpose: A customer-first attitude. There’s an anecdote of the founder being willing to meet any customer, but ignoring a potential investor by delegating to a colleague a meeting with a Morgan Stanley team, led by Chief Economist Stephen Roach.
— Broad employee ownership: In 2014, 84,000 employees out of 150,000 owned stock along with the founder, who owned only 1.4 per cent.2 They share an understanding that while an IPO would enrich some, the majority would lose their motivation. The essential requirements are hard work and dedication.
— Government support: Huawei grew revenues by building market share in China to become a national champion, then got support from the China Development Bank. Initially for $10 billion, it is now $30 billion.3 Building networks in Africa and Latin America, and low prices helped win deals in Europe. Mr Ren himself has said that without policy support, Huawei would not exist.
— Its unique culture and organisation: From inception, the founder was passionate about management, and about adapting methods and organisation. For instance, Huawei devised a top management model of a rotating CEO among three top executives, each of whom leads for six months, modelled on a flight of geese that change their order in arrowhead formation.4 Mr Ren is the mentor and coach. In March 2018 there was a change to a rotating Chairman position.
(The founder’s daughter, Meng Wanzhou (aka Sabrina Meng) is the Chief Financial Officer, and holds one of four vice-chair positions. His son Ren Ping works for a subsidiary providing reservations and trade show support.)
Another instance is Huawei’s Integrated Financial Services transformation program, which Ms Meng led since 2007. It was an eight-year partnership program between Huawei and IBM to develop data systems and resource allocation rules, operations, process optimisation, and internal controls.


— Huawei reportedly invests 10 per cent of annual revenues on Research & Development.

— Huawei also emphasises “the power of thinking”. Executives are urged to read beyond their domains, and books are everywhere.
These factors enable Huawei to solve problems for clients in diverse situations. Examples:
— In its early days, networks were at risk from rats gnawing through circuitry in desert and rural areas in China. Multinational vendors did not consider this their problem and left it to their customers. Huawei, by contrast, treated it as their own problem, and developed sturdier equipment and materials such as chew-proof wires. This experience later helped gain large accounts in the Middle East where customers faced similar problems.
— Other extreme environmental conditions have been addressed, such as base stations installed at high altitudes (at 6,500 metres on Mt Everest), or in the Arctic. These experiences helped a dedicated and committed workforce gain more clients. For instance, when expanding their 3G market in Europe, Huawei found that clients expected “base stations to be more compact, easier to install, greener, and more energy efficient, while offering wider coverage”. To cater to these needs, Huawei developed distributed base stations that could handle both large and small private networks, making them cheaper to deploy, which became popular with European carriers.
— The employee-ownership arrangement and associated dedication enable planning for the long term, as with the Chinese government. Huawei plans for 10 years, whereas competitors have to contend with quarterly financial considerations.1
Carriers buying Huawei network equipment get significant discounts in smartphones. Focusing on new technology not controlled by the giants of 3G such as Qualcomm, Ericsson, and Nokia, enabled Huawei to develop 4G, which is much faster and ideally suited for updating-apps, to the point that it competes with Samsungand Apple. Undercutting competitors has enabled it to sell to carriers, and its depth of products and technology has enabled it to meet customer needs, displacing competitors.
Huawei’s R&D Centre in Bangalore established in 1999 is its largest outside China, and it has offshore Global Network Operating Centres in Gurgaon and Bangalore, besides Romania and Nigeria. These GNOCs run networks not only in India but across the globe for a number of operators, offering managed network services integrating a range of equipment at low cost. With its market strength, depth of products, and access to funds, Huawei is likely to control network services in India and much of the world from now on through the 5G evolution cycle.
The only way for competition other than in-house NOCs in India is if the Government of India develops end-to-end supportive policies, transcends election cycles, and sponsors a consortium comprising a major transnational anchor, a system integrator, and local design and production wherever technological opportunities arise.


Located within Huawei’s Research and Development (R&D) campus in Bengaluru, the GSC is currently home to over 1,000 engineers, network operations specialists and support staff.





Shyam.Ponappa@gmail.com
4. Belasco, James A. Stayer, Ralph C. (1993). Flight of the Buffalo. New York, NY: Warner Books.

Friday, September 4, 2015

More On Those Dropped Calls


A basic problem is that the cost of spectrum and licences relative to earnings is too high, structurally.

Shyam Ponappa   |  September 3, 2015


Will the government's variant of "speak softly and carry a big stick" deliver Digital India in a hurry? Unlikely, because the problem is an overloaded system with a too-spare design, and insufficient cash flows. Increasing call drops are a symptom of inadequate carrying capacity for the demands of traffic, from voice to data in 3Gand 4G. These are structural problems, because the system doesn't generate sufficient investible funds; nor are conditions right to develop such investment capacity; nor are the prospects demonstrably healthy. The situation requires the policy changes outlined below, which only the government can bring about, as it has in the past.

A fundamental aspect of the problem is low spectrum availability. India's operators have 12-15 MHz, compared with a global average of 45-50 MHz. Leading countries have even more; for instance, operators in Seoul reportedly have 10 times more spectrum than operators in India. Limiting the spectrum available to operators compels them to invest more to deliver a given level of traffic and quality than if more spectrum were available.

There are other aspects as well:
  • high charges for licences and for spectrum, 8+4 per cent of (adjusted) revenues in addition to auction payments,
     
  • imported equipment paid for with a weak stream of local-currency revenues,
     
  • changes in spectrum holdings that require adjustment in equipment after older spectrum assignments lapse and new spectrum has been acquired, and
     
  • the burgeoning need for new investments for 3G and 4Gservices. Embedded in the latter is the additional overload caused by tower shut-downs and the difficulties in getting additional sites, apart from the need for more capital.
Add regulations that hinder spectrum trading and sharing, and we have a sector that is structurally weak and restricted in scope.

As for call drops, operators in developed markets experienced similar capacity pressures when there was very rapid growth in data usage, for instance AT&T in the USand O2 in the UK some years ago. The difference is that they were able to invest rapidly to shore up their networks. By contrast, Indian operators had to invest disproportionately in acquiring spectrum, leaving less capacity for investment in networks. For example, in 2014 operators in China reportedly invested $35 billion in 4G equipment, whereas in India, only $3 billion went into equipment. Most of its $32-billion investment - $29 billion, over 90 per cent - was for spectrum. There has also been the diversionary effect because difficult business conditions in the sector led to profits being invested elsewhere, instead of back into communications infrastructure. The difference in approach and functional capacity is stark: China is moving ahead with building high-speed data capability, while the struggle in India is with dropped calls and simply keeping users connected. The government, therefore, needs to facilitate conditions whereby operators invest substantial amounts every year.

For this to happen, the structure of high charges for spectrum and licences relative to earnings has to change, as do restrictive regulations. The monthly average revenue per user in India at the end of 2014 was of the order of Rs 110-120. Capital expenditure ranged from 13 to 15 per cent of revenues in 2014, rising to 20 per cent in 2015. The latter exceeds the percentage invested in the US - but the revenue in India is about 25 times less than the $50 revenue in America, and the US has had well-developed networks for decades. Meanwhile, the recent spectrum-sharing guidelines that restrict more than enable effective sharing epitomise our dysfunctional regulations.
1  It is baffling why the government would issue such retrograde regulation if the goal is digital development, because these guidelines do exactly the opposite of what is needed.

Government versus Private Sector


Meanwhile, there has been an escalating war of words between the government and service providers. The latter are trapped in a vicious circle of heavy investment requirement with low revenue-generation capacity, as explained above. Breaking out of this trap is possible only if the government develops conducive policies, as it did with the path-breaking changes associated with the 1999 New Telecom Policy (NTP-99). The change at that time was from up-front licence fees to revenue-sharing. It fell short because the government's share was too high, and began to work only after 2003, when government charges were reduced. In like manner, the government needs to frame policies applying similar principles to spectrum, and ultimately to network infrastructure, so spectrum and networks become more productive.

Our problems arise from three sources: regulations and government charges, operator behaviour and responses, and public opinion and the perceptions and actions of the judiciary. The government can take the initiative through creating policies that facilitate investment and service delivery. Many changes are purely administrative, such as permitting unrestricted spectrum sharing without additional "conversion" charges, or reducing licence and spectrum charges. Surely the department of telecommunications, the finance ministry, and the prime minister's office understand the logic of higher net present values that accrue from incremental revenues to operators. Conversely, any restriction of revenues or opportunity loss reduces the government's share, resulting in lower net present values. For example, restricting 3G roaming or insisting on payments to convert administered spectrum before it can be shared limit revenues, resulting in opportunity losses.

The government needs to be persuasive while acting decisively, to influence operators and public opinion through well-formulated systematic initiatives. Tighter monitoring of quality, including dropped calls, and related penalties are needed - but balanced with constructive policies. These could cover enabling regulations such as for roaming and secondary spectrum sharing with the government, and in developing a consortium approach for active network sharing initiated by the government with broad private participation, led by a private-sector partner. Other potential areas include enabling, organising, and facilitating broadband through cable networks, and inducting technologies such as TV White Space and satellites.

This is where the rhetoric of leading Team India has to be walked and not just talked, to persuade and lead the sector to collaborate and not undercut institutional development.



Shyam no-space Ponappa at gmail dot com

1 E.g., see https://www.linkedin.com/pulse/sharing-spectrum-operators-steeplechase-parag-kar


Comments

JAHAR

The huge bids while acquiring spectrum at the auctions held recently were bound to impact operator's short run cash flow and investment capability. This in turn impacts network management and up-gradation at least in the short run. No amount of dictats will change this

ASHOK

Would it be over dramartic to say that call drops are the gasps of an industry that is drowning in something other than windfall profits ! Indian businessmen are not saints, true, but they need a more sympathetic hearing in the government's court. If the Savile Row types are in distress, what will happen to the rest of us ?

MANOJ

Nice article, and good points about institutionalizing, not just doing jugaad. However, the point about equipment is not valid, falling capacity costs are the main reason telecoms are able to deliver such good service in India. (not customer support). Call drops are far lower in India than many far richer countries in the world. Some leading operators in UK & US both have much higher incidences of call drops. Instead of absolutism, the government should link the maximum charges leviable by the operator to Quality of Service, and let the operators decide how they are going to distribute their services.




Thursday, April 5, 2012

China 3: Build Comprehensive Ecosystems

Failures in electricity, transport and broadband have common strands. China's approach offers a possible alternative

Shyam Ponappa / Apr 05, 2012

India’s inability to address infrastructure is legendary, barring historical exceptions. It shows in electricity shortages, inadequate sanitation, broadband, railway services, airlines and roads. This explores the common strands of such failures, and a possible alternative drawing on China’s approach to development.

Electricity shortages are attributed to a tangle of factors: difficulties with fuel supply – for instance, for coal, there are problems in mining, and unrelated problems in transport, including the limitations of the railways – or the difficulties with nuclear and hydroelectric power development faced with overzealous activism, aggravated by the government’s poor record of compensation to affected people; unsustainable populist pricing; a lack of integrated planning (for example, generation capacity without linkages to fuel); and poor execution.

In transportation, there’s another tangle in the railways, with populism and deteriorating finances, yet making plans for super-fast trains. Airlines are treated as either a milch cow for government revenues or a sacred cow when it comes to providing endless, unviable subsidies.

Consider, also, spectrum and broadband. After mobile telephony’s meteoric rise, prospects of growth with pervasive broadband are receding, with little indication of supportive policies from the erstwhile New Telecom Policy, or NTP-2011, now NTP-2012-if-we’re-lucky. The episodic pronouncements and actions have been retrograde, such as the “tax attack” on Vodafone after the Supreme Court dismissed earlier tax claims, or the withholding of Qualcomm’s spectrum until recently. Worse, there’s an apparent pincer movement undercutting 3G by prohibiting roaming, while announcing spectrum auctions with hardly any spectrum available. Defence spectrum release has stalled, as Bharat Sanchar Nigam Limited has not built the alternative fibre optic network. Consequently, the department of telecommunications has only 150 megahertz of spectrum for commercial use, of which only 5 MHz remain for 3G. Combined with the prohibition on roaming, this effectively stymies 3G.

There’s more pressure on GSM operators coming up to “refarm” the 900 MHz spectrum when licences are renewed from 2014 to 2016. The best solution for incumbents as well as others without bandwidth below 1 gigahertz is to share networks. This would seem an obvious solution for 3G as well, and might even trigger or revive other technologies because spectrum is available, just as the dearth of spectrum may contribute to the untimely exit of WiMAX (802.16) or iBurst (802.20).

However, restrictions on roaming and insistence on spectrum auctions will ensure that spectrum sharing is either impractical or legally infeasible. This means India will deny itself the benefits of developments in spectrum sharing in TV white spaces in the US and in the UK, including its possible extension to other bands.

Comprehensive Ecosystems

Systematic plans to cripple our electricity, airlines, or telecommunications sectors could not do worse. Is there a way to break out of this downward vortex?  There could be, if the government took a problem-solving rather than a revenue-seeking approach, and sought to develop comprehensive, integrated ecosystems over a reasonable period.

Consider China’s approach to information and communications technology, epitomised by Huawei’s iconic position today. It is comprehensive, thorough and integrated, with the goal of significant scale and dominance. It covers the complete ecosystem, starting with education and training. Technology is a thrust area for economic growth, with many large universities, encouragement for graduate studies abroad, incentives for the diaspora to return, opportunities and support for faculty entrepreneurship, and encouragement for publications and patents. Infrastructure needs are well addressed. Manufacturing covers everything from wafer fabrication to chip design and production with vertical integration, a full range of products from supercomputers to gadgets, software development, telecommunications, the gamut of services including management, design and development, software products, and systems integration and support. There are sustained, long-term policies including restricted international entry in several domains, intellectual property laws, and incentives such as subsidised finance and purchasing support over decades. Together, they provide conditions for building immense scale.

What shows is thorough process planning, with follow-through in execution. Beginning with a comprehensive process flow design, they have filled the boxes in the flow chart with the constituent items in phases, each element resulting from its own process flow chain, with interim support for unconnected elements and activities. It shows multi-domain expertise and co-ordination across the board, aligned to achieve all the steps from initial goal setting to desired end results.

By contrast, India’s approach seems episodic. There is lack of clarity or agreement even on goals. The wrangling on spectrum is a case in point. The clamour for short-term government revenues is diametrically opposed to achieving ubiquitous, reasonably priced access, which from a logical perspective seems an unexceptionable goal for communications infrastructure. But opinionated views are expressed with scant regard for expertise or the lack of it, with little knowledge or understanding of the technology, finance, systems, or commercial logic.

To embark on a process as in China, there is a need for co-ordination of expertise from multiple domains, and aligned goals. For this, we must understand our limitations, and accept that reality may extend beyond any individual’s subjective grasp and limited frames of reference. The parable of the blind men and the elephant is apt. The following example illustrates this with reference to the optical spectrum.

What do we mean when we say something is “red”? It means there is light with a frequency of 400 terahertz to 480 THz depending on the shade of red, corresponding to a wavelength of 740 to 620 nanometres. That is the reality. Many of us see red as it is, and as others see it, but people with certain kinds of colour-blindness may see a shade of grey. Some of them may be unaware that what they see is different from what others see. This is illustrated in the different perceptions of a red Himalayan balsam (see diagram below). 



Source: http://landsat.gsfc.nasa.gov/education/compositor/em.html


Therefore, to understand how different stakeholders are affected, it is necessary to understand their perceptions and how reality affects them. It is imperative to seek inputs from multiple domains and stakeholders on the facts as we think we know them, and to co-ordinate these inputs in planning a process and its implementation. The more comprehensively we do this, the better.
                                                             shyamponappa at gmail dot com