Showing posts with label wireless regulations. Show all posts
Showing posts with label wireless regulations. Show all posts

Tuesday, February 14, 2023

Unmet Needs In Wireless Regulations


1. Telecommunications need priority as the primary enabler for growth, climate mitigation, and living conditions.  This holds for primary infrastructure as well in energy, transportation, water and sanitation, and for secondary infrastructure such as healthcare, education, and financial services. 

2. In the last decade, governments in India have taken out more than they have put into telecommunications by way of funding and/or enabling policy formulation. 

3. Given the high costs and impracticality of installing ubiquitous fibre, policies for wireless middle- and last-mile telecom connectivity are urgently required.


 Shyam Ponappa    |    February 14, 2023


Setting aside the uproar in financial markets and politics for a moment, consider just some mundane facts on a deficient aspect of infrastructure. The urgent present and future need is to address the missing links in our connectivity chain with appropriate, enabling regulations.

One would think that in this era, governance in India would focus on digitisation and digital connectivity. It is one of our critical infrastructure needs in a set that includes transport and energy. One might even assume from the schemes and announcements about digitisation that the government accords priority to these areas. So what is it that gives one pause?

India touts its resolve in this sector. Yet, in the ground realities of its expenditure on the sector, policies and actual reforms, this resolve is lacking. Moreover, many urgent requirements are actually for appropriate, timely policy responses, not for government funding, as discussed below.

The table (Spending Plan) shows budgeted expenditure (revised figures for 2022) for roads, railways, and communications in the last three years.

chart
















The expenditure on roads and railways is twice the amount on communications, for which there is also a lower increment for next year. Of the Rs 1.23 trillion, BSNL gets Rs 52,937 crore, the rest of telecommunications gets Rs 44,642 crore, and postal projects get Rs 25,814 crore.

If emphasis on digitisation and connectivity is really critical, is the budgeted amount disproportionately low? Considering that efficiency and productivity drive growth, climate mitigation, and living conditions, and gain from these enablers regardless of the mix of technology, capital, land, and human resources, digital effectiveness and efficiency need prioritisation as multipliers. It is as though we simply do not recognise that communications is the leading enabler.

What Can Be Done About This?

The way the following instances were dealt with over the last several years show how policy deficiencies may be more purposefully addressed. 


The Vodafone Saga

The handling of the Vodafone saga by both the United Progressive Alliance and the National Democratic Alliance exemplifies one type of problem. Briefly, Vodafone was saddled with arbitrarily imposed retrospective taxes in 2007, which the Supreme Court set aside in 2012. Then Finance Minister Pranab Mukherjee piloted legislation whereby retrospective policy changes justified tax claims on offshore stake acquisitions of Indian companies. Vodafone and other operators were also battling licence fees claimed on non-telecom revenues included in “aggregate gross revenues” (AGR) since 2003, with mounting interest dues. In August 2021, the government finally gave in on retrospective taxes on Vodafone (and Cairn Energy) after arbitration awards against it. In September 2021, a telecom relief package offered a four-year moratorium for the beleaguered operators’ debt repayments, while finally excluding non-telecom revenues for licence fee calculations.


The relief was temporary, with interest accruing on all outstanding dues. There was much more that needed to be done to prevent prolonged attrition with high opportunity costs, because of the non-availability of services severely constraining India’s capacity and productivity. Examples include revenue sharing for spectrum as for licence fees, and active network sharing through open access to operators on payment (see https://organizing-india.blogspot.com/2021/10/telecom-reforms-relief-with-hope.html).


Vodafone Idea and India’s users suffered the cost and deprivation of services until the government decided on February 3 to convert Vodafone’s dues of Rs 16,133 crore into government-held equity. Meanwhile, Vodafone Idea was down to under 244 million subscribers by the end of November 2022, having lost 21 million users. Its debt rose because the government dithered with the afterthought that Vodafone Idea should invest more before the government fulfilled its conversion of dues to government-owned equity. Clearly, future policies need to be stable and well-thought-out in the public interest, without whimsical changes or arbitrary conditions.


The irony is that in the UK and Europe, Vodafone competes with Orange, BT, Telefonica, and Deutsche Telekom with state-of-the-art services, and runs Europe’s largest 5G network in 12 countries. In partnership with the Kumar Mangalam Birla group, it is the sole surviving international telecom operator in India.


What if governments had acted quickly to correct anomalies such as retrospective taxes and defined AGR rationally? Imagine what the opportunity gains might have been with three strong operators in a well-regulated market of over a billion.


The Elusive Goal Of Optical Fibre For All 

A second instance of inappropriate policies is that of wireless policies and the use of optical fibre. Ratings firm ICRA recently stated that full-scale 5G deployments across India would require expenditure of about Rs 3 trillion for densification, because nearly two-thirds of the towers lack fibre connectivity. Heavy investment appears unlikely given the telcos’ expected debt of Rs 6.3 trillion by March 2023 (see https://www.business-standard.com/article/economy-policy/5g-infra-to-cost-rs-3-trn-in-next-4-5-yrs-amid-elevated-debt-levels-icra-123013001026_1.html).


With the high costs for fibre rights-of-way and the installation difficulties on the ground, it is baffling that our policymakers in the government including the Department of Telecommunications (DoT) have not engaged with the urgent need for enabling wireless policies even for towers, based on successful models in other countries.


The DoT did, in fact, model the enabling wireless regulations for 5 GHz in October 2018 on the FCC template for Wi-Fi (for access and for point-to-point with limited capacity: https://organizing-india.blogspot.com/2018/11/a-great-start-on-wi-fi-reforms.html). However, this was not followed up with regulations for middle-mile, high-capacity wireless for towers and small cells, as is only logical, that is, for 60 GHz V-band and 70-80 GHz E-band for longer distances. Without these, and with pricing for microwave being restrictive here, there are gaps between the user-access-end and the core-network-with-fibre-termination-points. These gaps would be too expensive to fill out entirely with fibre optic cables, as is evident from ICRA’s estimate above. Yet, many officials repeatedly talked about fibre connectivity to all, which after consideration should strike anyone as patently infeasible because of our size, population distribution, and cost-and-revenue structure.


Other critical wireless regulation required now is enabling 6GHz for Wi-Fi, allowing speeds of up to 10 Gbps, and support for local product development and production instead of relying on imports.


Considering how resources are channelled and regulations attended to, the communications sector needs far greater emphasis and action on well-thought-out, timely policy intervention as indicated above to better support our economy and society.



 Shyam (no space) Ponappa at gmail dot com

Thursday, April 2, 2020

After the Lockdown



Planning for the revival of the economy after the lockdown.


 Shyam Ponappa    |   April 2, 2020 00

This is a time when, as the authorities deal with a lockdown, there needs to be an equal emphasis on providing for large numbers of people without the money for food and necessities, while the rest of us wait it out. Hard as it is, an MIT scholar writes that after the Spanish flu in 1918, cities that restricted public gatherings sooner and longer had fewer fatalities, and emerged with stronger economic growth.1 It is likely that costs and benefits vary with economic and social capacity, and we may have a harder time with it here. Going forward, government action to help provide relief, rehabilitate people and deal with loss needs to be well planned, including targeting aid to the urban and displaced poor.2
As important now as to ensure the lockdown continues is to plan on how to revive productive activity and the economy, and restore public confidence. A systematic approach will likely yield better results.
A major element of the recovery plan is steps such as liberal credit and amortisation terms, perhaps much more than the three-month extension the Reserve Bank of India (RBI) has announced. A primary purpose is the re-initiation of large-scale activities such as construction, of which there are reportedly about 200,000 large projects around the country. These have to be nursed back to being going concerns. The RBI may need to consider doing more, including lowering rates.
An ominous development that has grown as the economy slowed is financial stress that could swell non-performing assets (NPAs). At the half-year ending September 2019, about half of non-financial large corporations in India, excluding telecom, showed financial stress (see table).


Source: Krishna Kant: "Coronavirus shutdown puts Rs 15-trillion debt at risk, to impact finances", BS, March 30, 2020:
https://www.business-standard.com/article/markets/coronavirus-shutdown-puts-rs-15-trillion-debt-at-risk-to-impact-finances-120032901036_1.html


These include some of India’s largest companies, producing power, steel, and chemicals. The 201 companies have total debt of nearly Rs 15 trillion, more than half of all borrowings. There is also the debt overhang of the National Highways Authority of India, and of the telecom companies. Ironically, the telecom companies are our lifeline now, despite having nearly collapsed under debt because of ill-advised policies in the past, which have still not changed. Perhaps our obvious dependence on telecom services now will spark well conceived, convergent policies for this sector, so that we can function effectively.  
A start with immediate changes in administrative rules for 60GHz, 70-80GHz, and 500-700MHz wireless use, modelled on the US FCC regulations as was done for the 5GHz Wi-Fi in October 2018, could change the game. It will provide the opportunity in India for the innovation of devices, their production, and use, possibly unleashing this sector. This can help offset our reliance on imported technology and equipment. However, such changes in policies and purchasing support have eluded us thus far. Now, the only way our high-technology manufacturers can thrive is to succeed internationally, in order to be able to sell to the domestic market. Imagine how hard that might be, and you begin to get an inkling of why we have few domestic product champions, struggling against odds in areas such as optical switches, networking equipment, and wireless devices. For order-of-magnitude change, however, structural changes need to be worked out in consultation with operators in the organisation of services through shared infrastructure.


For the longer term, a fundamental reconsideration for allocating resources is needed through coherent, orchestrated policy planning and support. What the government can do as a primary responsibility, besides ensuring law and order and security, is to develop our inadequate and unreliable infrastructure, including facilities and services that enable efficient production clusters, their integrated functioning, and skilling. For instance, Apple’s recent decision against moving iPhone production from China to India was reportedly because similar large facilities (factories of 250,000) are not feasible here, and second, our logistics are inadequate. Such considerations should be factored into our planning, although Apple may well have to revisit the very sustainability of the concept of outsize facilities that require the sort of repressive conditions prevailing in China. However, we need not aim for building unsustainable mega-factories. Instead, a more practical approach may be to plan for building agglomerations of smaller, sustainable units, that can aggregate their activity and output effectively and efficiently. Such developments could form the basis of numerous viable clusters, and where possible, capitalise on existing incipient clusters of activities. Such infrastructure needs to be extended to the countryside for agriculture and allied activities as well, so that productivity increases with a change from rain-fed, extensive cultivation to intensive practices, with more controlled conditions.


The automotive industry, the largest employer in manufacturing, provides an example for other sectors. It was a success story like telecom until recently, but is now floundering, partly because of inappropriate policies, despite its systematic efforts at incorporating collaborative planning and working with the government. It has achieved the remarkable transformation of moving from BS-IV to BS-VI emission regulations in just three years, upgrading by two levels with an investment of Rs 70,000 crore, whereas European companies have taken five to six years to upgrade by one level. This has meant that there was no time for local sourcing, and therefore heavy reliance on global suppliers, including China. While the collaborative planning model adopted by the industry provides a model for other sectors, the question here is, what now. In a sense, it was not just the radical change in market demand with the advent of ridesharing and e-vehicles, but also the government’s approach to policies and taxation that aggravated its difficulties.
Going forward, policies that are more congruent in terms of societal goals, including employment that supports the development of large manufacturing opportunities, need to be thought through from a perspective of aligning and integrating objectives (in this case, end-to-end transportation). Areas such as automotive and other industries for the manufacture of road and rail transport vehicles need to be considered from the perspective of reconfiguring the purpose, flow, and value-added, to achieve both low-cost, accessible mass transport, and vehicles for private use that complement transportation objectives as also employment and welfare.
Systematic and convergent planning and implementation across sectors could help achieve a better revival.

Shyam (no space) Ponappa at gmail dot com