Friday, November 7, 2014

(Fixing) India's Systemic Flaws


We need breakthroughs in tax claims and coal and spectrum allocation, but most of all, in societal accord


On the face of it, several developments augur well for the economy. But major systemic flaws persist that must be overcome.

Some gains have resulted from Prime Minister Narendra Modi's direct selling and "heavy lifting", as in eliciting Japanese investments. Others, such as the drop in petroleum and commodity prices, are attributable to extraneous factors. The positive developments that seem to be coalescing into a glow on the economic horizon include:
  • The revival of stalled projects.
     
  • A reduction in raw material costs, with oil prices now well under $90 a barrel.
     
  • Significant investments from Japan's SoftBank in Snapdeal and Ola; other significant investments and announcements in e-commerce, for example, Flipkart and Amazon.
     
  • The implementation of electronic toll collection (ETC) on our highways. Introduced between Ahmedabad and Vadodara on National Highway 8 (NH-8) in 2013, the ETC became available last week between Delhi and Mumbai on NH-8. It is expected to be available on all national highways in the next two months. Vehicles with prepaid tags can drive through without slowing down, whereas until now, all vehicles had to stop to pay tolls. The productivity gains will be enormous, with fuel savings across toll stations estimated at Rs 60,000 crore (see BS, October 30, 2014 and BS, October 31, 2014 for details).

But all is not entirely well. The fiscal deficit is at 80 per cent of what was budgeted for the full year; there was a decline in projects completed in the September quarter; and there is uncertainty about growth rates.

The real issue, though, is that major systemic flaws persist, resulting in growing economic and operating constraints. There are the problems of retrospective tax claims, of coal allocation and of spectrum allocation. In the societal dimension, there are continuing indications of disharmony, resulting in wariness and insecurity about whether we have a unifying or divisive top leadership, let alone rank and file. Proceeding with business as usual with the present ineffective ways will lead to continuing and increasingly overwhelming detrimental effects. Each of these areas needs breakthroughs to achieve convergent, synergistic results.

Coal

Over 60 per cent of stalled projects tracked by the Performance Management Group in the Cabinet secretariat are power projects, held up because coal is not available. Coal-mining rights are to be auctioned on the lines of spectrum. What are the likely outcomes?

While the government was jubilant about funds collected from the auctions, this created enormous capital and operating constraints for the communications sector. This is because the Rs 1.05 lakh crore bid for spectrum became unavailable for network construction and operations, and the limited bandwidth available to each operator adds to costs and restricts delivery capability. Growth in network capacity has deteriorated to the point where we have higher levels of dropped calls in metros, with continuing poor broadband access countrywide. The effects on productivity are ruinous.

What can we expect from mining rights auctions? If the results are as for the spectrum auctions, we'll have high treasury collections, high life-cycle project costs affecting critical inputs like electricity, steel and aluminium, and a reduction in investment in mining operations and downstream manufacturing. These are logical outcomes: the consequence of higher costs is either higher prices, or financial under-recovery leading to collapse, and capital used for auctions is unavailable for investment. Instead, what we really want from the mining allocation is inexpensive electricity and efficient production of industrial materials, such as steel and aluminium.

The financial insolvency of our state electricity boards reflects the magnitude of the problem. Even the story of Gujarat's electricity distribution raises questions for the rest: Gujarat's average farm tariff is under Rs 1 a unit, compared with a non-farm tariff of Rs 4-5 (see "Farmers pay 56 paise per unit of electricity"*). The high cost of providing these connections is unviable with the low revenue of 56 paise a unit. This is why there is a backlog of about 400,000 farmers waiting for connections despite Gujarat's "surplus" of over 2,000 megawatts. Distributing electricity at such low rates is simply unsustainable, and the situation is much worse in states providing free electricity.

A possible way to approach this is to appoint two or three individuals with the integrity and competence to work with the government, industry and experts to develop an allocation plan. If this "beauty-parade" approach seems too utopian or academic for India, please be aware that this is precisely how land acquisition was actually done for the Calcutta Metro around 1982 after years of delay, and for part of the Bangalore Metro in 2006.

Spectrum

The spectrum constraints, meanwhile, show in the high levels of dropped calls because of congested lines, and the slow rollout of networks into rural areas. This slowness is because of the unfavourable economics: of high cost and difficult execution, with lower revenue potential. What we want from spectrum allocation is access to broadband networks at prices that will result in productivity gains. Instead, we have neither adequate broadband networks, nor sufficiently widespread access for productivity. A better solution is pooled networks with mandatory shared access on payment, with the government getting a share of revenues.

Ecosystems

Apart from inadequate infrastructure, logistics, finance and regulations, all of which must be well-orchestrated to achieve supportive ecosystems for investment and operations, the tax-claims fallout continues to undermine growth prospects. While the Vodafone problem may be finally resolved, the closure of Nokia's manufacturing facility in Chennai because of tax claims undercuts all the sales talk. Each sector needs a supportive ecosystem, integrated with the rest.

Social Disharmony

Above all, social disharmony seriously affects our capacity for collective action. Social coherence is essential for constructive development. The leadership's effectiveness in reaching out and inspiring constructive aspirations can help to harmonise and channel citizens towards desirable common goals. Such collective initiatives would reduce our fractiousness and infighting, making win-win outcomes more possible.

The solutions in all these areas need to be path-breaking, based on integrity, trust and bold, collaborative action. We have to learn these ways.






                                                                              Shyam (nospace) Ponappa at gmail dot com

*http://indianexpress.com/article/cities/ahmedabad/farmers-pay-56-paise-per-unit-of-electricity/

Comments (2):

  • karthikeyan
    Tax Havens can be created , for NOKIA alikes ?? :)
  • ashok
    The state of the power sector can make or break Make In India. Worthy of attention at the highest levels of government. 2. Whether spectrum or coal, the government can meet the industry half way by taking its entitlement as a revenue stream rather than an initial lump of capital.


Wednesday, August 10, 2011

Management as Capital



Learning and applying good management practices can help improve productivity

Shyam Ponappa / August 4, 2011


At a time of concern about sustained momentum in India’s economic growth, some recent findings including a case study in India offer fresh pointers on the implications for management and organisation in emerging economies.

Competition ≠ Efficiency

A widely held assumption is that competition results in efficiency. The reasoning is that market forces and competition compel enterprises to evolve into efficient producers. So, does management affect productivity?

An article in The American Economic Review posits that developing economies appear to suffer a shortage of what the authors term ‘managerial capital’1, that is, management and organisation. The authors also note that this aspect has been ignored in studies of development and growth. This is not surprising, given the completely different domain expertise compared with economics, such as, the skills required to understand financial statements and linkages to operations, or organisational structure and effectiveness, and the difficulties in defining and measuring managerial inputs. However, this does not diminish the importance of managerial inputs for growth and development, just as factors not well understood by weather forecasters nevertheless do influence the weather.

The authors cite evidence that managerial know-how can improve the productivity of other inputs including human resources and equipment, and help to better deal with resource constraints, by planning, acquiring and configuring assets to optimise outcomes.

Management and organisation are accepted as critical inputs for effective performance in developed economies. This is true for enterprises at the firm level, for sectoral policy and regulations, and for the economy as a whole. Anecdotal evidence suggests this is less so in developing economies, both in terms of prevalence and acceptance. Also, the wide variability in productivity in developing countries’ plants has been attributed to differing management practices, but so far with little validation based on data.


Differences in management practices can vary by nearly 30 per cent between the “best” and “worst” countries. The accompanying chart shows overall management scores for a number of countries. The studies consider differences in managerial practices between emerging and developed economies, as well as interventions to improve practices in the former, comprising training and advisory inputs. The results imply that good practices can be learnt and applied in developing economies.


(Number of firms surveyed shown on or next to each bar)

Source: http://www.nber.org/papers/w172312

An experiment in textile companies in India over a two-year period supports these findings.3 The report covers 20 plants in 17 companies. Of these, 14 plants in the treatment set were given active interventions, while six were treated as control units. The active set went through a diagnostic phase over a month, followed by an implementation phase of intensive support over four months, and a measurement phase thereafter for several months. The control units were only exposed to the diagnostic phase. The management inputs covered a range, such as lean manufacturing practices including sales and inventory management, quality control and human resource management.



The interventions by transnational consultants were estimated at $250,000 (Rs 1.125 crore) in each firm if provided at commercial rates. The report estimated the productivity in the treated plants to improve by 18 per cent, with net gain in profits in the first year itself estimated at 40 per cent above costs, at $350,000 (Rs 1.575 crore).



Implications



(i) A need to improve enterprise management and organisation: the reports show evidence of the inadequacy of management and organisation prior to interventions, and of the benefits of upgrading management practices with measures that are considered standard operating procedures in advanced economies. There is explicit evidence from textile companies in India that the induction of such practices results in significant productivity gains.


(ii) Delivery methods: the report found that common practices, such as preventive maintenance, were known but not adopted, because managements thought they would not be profitable. Such items account for 45 per cent of practices in the interventions. For uncommon practices, the problem was lack of awareness.


The question is whether the approach – of a transnational consulting firm providing advisory services for several months – is the preferred way of upgrading practices at enterprises, or if there may be other practicable ways that are equally effective and efficient. For instance, whether distance education is a plausible method for learning or participating in substantive diagnostics and best-practice dissemination for enterprises. The issues are whether management institutes or local consultants can develop effective programmes for delivery as modules; whether such methods can be effectively developed and delivered through the Internet; whether the National Skill Development Corporation, the National Productivity Council and the like can co-ordinate such initiatives; and whether systems integrators can grow to deliver such services.


(iii) Sectoral management and organisation: beyond the enterprise level, developing economies sorely need management and organisation at the sectoral level. Here, it is not so much about best practices as it is about designing the right framework of goal-oriented policies and procedures appropriate for the given socio-economic context. Sectoral frameworks are essential to create productive sectors and to prevent the flight of capital — major Indian groups invest abroad rather than in India, even when there is much room for growth here. While the crisis precipitated by the 2G scam has forced the government to undertake drastic reforms in communications and spectrum management, the power sector is an equally critical area, which desperately needs radical reform.


(iv) Local play: Stanford, Massachusetts Institute of Technology, Harvard, World Bank and the European Bank for Reconstruction and Development have conducted path-breaking studies on management inputs and upgradation. Considerable work needs to be done by Indian institutions — there seem to be no such studies at present. As for local funding, the significant Indian donations are either to self-run institutions or to iconic foreign institutions, a notable recent exception being the Nilekanis.



shyamponappa at gmail dot com


1 “What Capital is Missing in Developing Countries?”, Miriam Bruhn, Dean Karlan and Antoinette SchoarThe American Economic Review, May 2010:

http://karlan.yale.edu/p/BruhnKarlanSchoar_AER_P&P.pdf

2 “The Land that Lean Manufacturing Forgot? Management Practices in Transition Countries”, Nicholas Bloom, Helena Schweiger and John van Reenen, July 2011:

http://www.nber.org/papers/w17231.pdf

3 “Does Management Matter? Evidence from India”, Nicholas Bloom, Benn Eifert, Aprajit Mahajan, David McKenzie and John Roberts, Jan 2011:

http://www.nber.org/papers/w16658.pdf

Thursday, October 1, 2009

Beyond RTI: The Use of Information





Govt and regulatory focus needs to be on the use of available information for better results
Shyam Ponappa / New Delhi October 1, 2009



The principle of the Right To Information, once established and accepted, opens up a wide range of practical applications. There are, however, many potential areas of information usage for better management for which the data are already there, although perhaps not in an easily accessible form. Some examples are: the supervision of bank loans by the Reserve Bank of India for each sector, eg, housing, commercial real estate, the priority sectors including SMEs, and specific aspects of infrastructure; the acquisition and distribution of electricity; and communications. Consider some aspects of communications where the use of available data could result in better delivery through regulatory intervention.

Two areas relating to information use in communications are (a) spectrum management, and (b) monitoring and administering the Quality of Services, eg, interconnection. Both areas require clarity regarding regulatory powers to enforce compliance and impose penalties before smart applications are feasible, as well as augmenting the powers of the regulator, in this case, the Telecom Regulatory Authority of India (Trai), to supervise usage, ensure compliance, and impose penalties where necessary. However, as described below, the data are already available for hands-on spectrum management. The data on interconnection may be there, although perhaps not yet compiled in an accessible form.

Spectrum Management

Figure 1 is a graphic representation of spectrum allocation and usage in January 2009.

Figure 1: Spectrum Status (MHz) by Circle & Operator, January 2009

This report was compiled by JP Morgan for equity investors, but there are good reasons for regulators to use similar graphics to track status and resource use among operators on a real-time basis.

The darkest squares (blue on a colour screen) indicate existing operators who are using their allocated spectrum. The next darkest (green on a colour screen) have been allocated spectrum, but have not begun operations. The next lighter shade (yellow on a colour screen) with a ‘Y’ denotes that licences have been obtained while spectrum allocation is awaited; ‘A’ indicates that licences have been applied for and awaiting both licence and spectrum. The lightest shade (white in colour) indicates no licence and no spectrum.

It is evident at a glance from the colour coding that the green squares (second-darkest) indicate possession of spectrum that is not in use, ie, either the legitimate condition of awaiting a network rollout, or the speculative state of ‘spectrum squatters’. This highlights the set that requires hands-on monitoring, facilitating time-bound stipulations for usage, followed up with incentives and penalties. Once such systems are set up online, real-time status reports will be readily available for assessment and action, facilitating regulatory intervention to yield improved service quality for users. There is every reason for such information and graphics to be collated and made available in the public domain.

Interconnection

The quality of service in communications can fall short of optimal levels for a variety of reasons. In urban areas with heavy traffic, the problems of congestion may be aggravated by a shortage of spectrum, ie, the limited allocation of radio frequency spectrum to operators. But there may be self-induced problems as well, such as inadequate infrastructure, including poor interconnections with other networks.

I was recently in an area northwest of Uttarkashi where the only phones that could operate were on the Idea Cellular network. The curious and disabling circumstance was that Airtel and Vodaphone users could not connect with any network. The question is why, given that the Trai’s charter is to ensure that all users of any network should be able to connect to any other network. As far back as 2003, the Trai had ruled that all operators must provide interconnection to Tata Teleservices. In August 2008, the Trai directed GSM operators to provide interconnection facilities to Reliance Communications within seven days. If my understanding is correct, the implication is that users of any network, such as Airtel or Vodafone as in our group, should have been able to connect to the Idea network. Yet, here we were, not able to access the communications network except for subscribers to Idea Cellular.

It should be possible for the Trai to monitor Points of Interconnection (POIs) in real-time and track the extent of congestion, instead of doing one-off reports as in November 2005.* Such information, once collated as in the spectrum status report and made available on an ongoing basis, would enable remedial action to ensure that users have convenient access to networks at all locations where any network is accessible.

These are indicative examples of how the imaginative presentation of available information can be used to improve delivery. Government agencies and regulators can apply imagination and initiative in designing and applying such tools for effective management and results.



* See ‘Study paper on State of Indian Telecom Network’: http://www.trai.gov.in/trai/upload/StudyPapers/5/spaper2nov05.pdf